Prestige Kompally Construction Update
This construction update is dated July 2026 and reflects the current pre-launch stage; progress is confirmed via official channels.
This Prestige Kompally construction update, dated July 2026, sets out where the site stands today. For Prestige Kompally, a pre-launch township on NH-44 in North Hyderabad, the project is currently at the pre-launch and enabling-works stage. The main gate and boundary wall are progressing, and early internal road layouts are being shaped ahead of the official launch.
Because the project has not yet launched, on-ground activity is limited to preparatory work rather than tower construction. Foundation work for the 12 towers begins after the launch planned for 15 December 2026. For the wider picture, follow the Prestige Kompally construction status hub, and treat this snapshot as accurate for July 2026 only.
Current Site Status, July 2026
The table below summarises the status of each activity as of this update. Statuses change as the project moves towards launch.
| Activity | Status |
|---|---|
| Layout / planning approvals | Received |
| Boundary wall & main gate | In progress |
| Internal road layouts | Early stage |
| RERA number | In progress, due Nov 2026 |
| Tower foundation | After launch (post 15 Dec 2026) |
Status indicative as of July 2026. Updates are shared via the official website and CRM as work progresses.
Enabling Works and Boundary
The current focus is enabling works: the main gate and boundary wall along the 40-acre site are progressing. This preparatory stage secures the site perimeter and sets up access before heavy construction begins. It is the normal first phase for a large township ahead of launch.
Internal Roads and Site Layout
Early internal road layouts are being shaped to define movement across the site and position the 12 towers. At this stage the work is about marking and grading rather than final roadbuilding. The detailed layout firms up as the project moves into mobilization after launch.
RERA Registration Status
The RERA number is in progress and expected around November 2026. Registration is a key milestone because it publishes the approved plans and the committed possession date. Verify the number on the authority's portal once it is issued before making any commitment.
Next Steps After Launch
After the launch planned for 15 December 2026, the site moves into mobilization, heavy excavation and foundation work for the 12 towers. Model apartments are also expected to begin soon. These are the first stages of vertical construction and will be tracked in future updates.
Bottom line: As of July 2026 the project is at pre-launch enabling works, boundary wall and main gate progressing; tower foundations follow the 15 Dec 2026 launch.
What Comes Next
Once the project launches, expect site mobilization, heavy excavation and foundation work for the 12 towers, followed by structural progress tower by tower. Model apartments are set to begin soon, giving buyers a physical reference for the finish and layout. The township is developed as a joint venture with the Prestige Group, and progress is published through official channels.
Bottom line: The near-term roadmap is mobilization, excavation and foundations after launch, with model apartments due soon.
How to Track Verified Progress
For a pre-launch project, rely on official sources rather than informal claims. Construction updates are shared via the official website and CRM, and the approved plans and possession date are published once the project is registered. Confirm the current stage and the RERA number on the TS-RERA portal once available. For local context, see the Kompally real estate guide.
Bottom line: Track progress through the official website, CRM and the TS-RERA record, and treat this July 2026 snapshot as time-stamped.